# Fusion Lockeed PEB — Client File Package Index

Project: Fusion Lockeed PEB | Date: 2026-08-03 | PM: FD-PM-LOCKEED-001 (Asad Raza)
Geometry: Two steel sheds (54×104 + 74×104) sharing 10-ft brick spine wall, eave 18 ft, ridge 26 ft.

## Folder: 3D/
- Fusion_Lockeed_PEB_Accurate_3D.png  — accurate isometric (RELEASE)
- Fusion_Lockeed_PEB_Basic_3D.png      — AI concept (superseded)

## Folder: Drawings/  (Structural GA — release-grade)
- S-101_GA_Plan.dxf / .png             — footings + column grid
- S-102_Front_Elevation.dxf / .png     — gable end, double-pitch
- S-103_Rear_Elevation.dxf / .png
- S-104_Longitudinal_Section.dxf / .png — 10-ft brick wall + dual ridge
- S-105_Schedules.dxf / .png           — column/rafter/footing schedules
- Lockeed_PEB_Structural_Schedules.xlsx

## Folder: BOQ/
- master_boq.xlsx   — 3 sheets (Summary / Rate_Analysis / Assumptions)
- master_boq.pdf    — Fusion-branded cover + BOQ table
- boq_summary.md    — executive summary
- TOTAL: PKR 231,118,887 (10% O&P)

## Folder: MEP/  (PRELIMINARY / FOR COORDINATION)
- M-101_Electrical.dxf / .png
- M-201_HVAC.dxf / .png
- M-301_Plumbing.dxf / .png

## Folder: Documents/
- Geometry_Control_Basis.md
- Project_Manager_Assignment.md
- SignOff_FD-ARCH-SR-001.md

## Next Steps
1. Confirm MEP scope → replace provisional lump sums with detailed BOQ.
2. Client sign-off on proposal → then Qadirabad-136-sheet working-drawing package + client-file site.